RFQ Preparation Checklist
- Legacy actuator and controller baseline
- Retrofit envelope and mounting constraints
- Downtime window and deployment batches
- Acceptance criteria after retrofit commissioning
Upgrade legacy articulated robot joints with modern actuator modules to improve torque stability, precision, and serviceability.

| Evaluation Metric | Typical Range | Buyer Relevance |
|---|---|---|
| Retrofit Commissioning Time | 2–5 days per axis (standard), 1–2 weeks (complex) | Affects production disruption and total transition cost. Must align with factory downtime windows. |
| Mechanical Interface Compatibility | ISO 9409 flange / custom adapter plate | Non-standard legacy flanges require adapter design, adding 2–4 weeks to the retrofit timeline. |
| Performance Delta Post-Retrofit | 15–40% improvement in repeatability | Quantified improvement justifies the retrofit investment to operations management. |


Yes. We support phased migration plans to reduce production interruption. Most factories start with the highest-wear axis and validate before proceeding to remaining joints.
Yes. We design custom adapter plates with DFM review to bridge legacy interfaces. Typical turnaround is 2–3 weeks including FEA verification.
We have supplied retrofit actuators for platforms from major brands including FANUC, ABB, and KUKA legacy models. Contact us with your robot model for compatibility assessment.
Engineering RFQ Email
Include torque-speed targets, annual volume, and timeline.
Lead Robotics Engineer
+86 18857971991
Direct technical conversation with our lead robotics engineer.